Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Bromsgrove, Worcestershire

Rear extension planning drawings in Bromsgrove

Rear extension planning drawings in Bromsgrove: measured survey, design options, planning drawings and the application, handled for you. We measure the house, show you what the rules allow, price it in writing and build it.

Bromsgrove sits in Worcestershire, with postcode districts including B60 and B61. Rear extension applications in Worcestershire are householder applications, which councils aim to decide within about eight weeks.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

What do rear extension planning drawings cost in Bromsgrove?

As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a rear extension in Bromsgrove?

Whether your rear extension in Bromsgrove needs a planning application depends on its size, your house and any local restrictions.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Bromsgrove like to extend?

Red-brick terraces and 1930s semis make up much of Bromsgrove. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a rear extension in Bromsgrove comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Rear extension planning drawings near Bromsgrove

Close by, we work in Redditch, about 5.2 miles away, and Droitwich, about 6.1 miles away.

Other work in Bromsgrove:

All rear extensions in Bromsgrove

FAQ

Rear extension planning drawings questions in Bromsgrove

Do I need planning permission for a rear extension in Bromsgrove?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Is the site visit in Bromsgrove free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Are the drawings mine?

You can use them to get other quotes, subject to the terms.

How long does a rear extension take to build in Bromsgrove?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Bromsgrove?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price