Rear extension planning drawings in Redhill
Thinking about a rear extension in Redhill? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Redhill sits in Surrey, with postcode districts including RH1 and RH2. Planning applications in Redhill go to the local planning authority covering Redhill, and we check its local design guidance for rear extensions before drawing.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Redhill?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a rear extension in Redhill?
The planning route for a rear extension in Redhill is set by England's householder rules and your council.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Redhill like to extend?
Around Redhill the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.
How a rear extension in Redhill comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Redhill
Neighbouring places we cover include Reigate (1.5 miles) and Horley (4.6 miles).
- Rear extension planning drawings in Reigate
- Rear extension planning drawings in Horley
- Rear extension planning drawings in Caterham
- Rear extension planning drawings in Coulsdon
- Rear extension planning drawings in Banstead
Other work in Redhill:
FAQ
Rear extension planning drawings questions in Redhill
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
What postcode areas do you cover around Redhill?
Including RH1 and RH2, and the surrounding Surrey area.
Can planning conditions affect the build?
Yes, for example matching materials or obscure glazing. We plan for them.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Can you match the brick or stone on my Redhill house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.