Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Wellington, Shropshire

Rear extension planning drawings in Wellington

We plan and build rear extensions for homeowners in Wellington. Measured survey, design options, planning drawings and the application, handled for you. Start with a free site visit, then a written price once the design is agreed.

Wellington sits in Shropshire, with postcode districts including TF1 and TF5. Planning applications in Wellington go to the local planning authority covering Wellington, and we check its local design guidance for rear extensions before drawing.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

What do rear extension planning drawings cost in Wellington?

As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a rear extension in Wellington?

Whether your rear extension in Wellington needs a planning application depends on its size, your house and any local restrictions.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Wellington like to extend?

Wellington has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a rear extension in Wellington comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Rear extension planning drawings near Wellington

Neighbouring places we cover include Hadley (1.4 miles) and Telford (3.3 miles).

Other work in Wellington:

All rear extensions in Wellington

FAQ

Rear extension planning drawings questions in Wellington

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Are the drawings mine?

You can use them to get other quotes, subject to the terms.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Wellington?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price