Nelson, Lancashire
Rear extension planning drawings in Nelson
Thinking about a rear extension in Nelson? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Nelson sits in Lancashire, with postcode districts including BB8, BB9 and BB10. Planning applications in Nelson go to the local planning authority covering Nelson, and we check its local design guidance for rear extensions before drawing.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Nelson?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a rear extension in Nelson?
The planning route for a rear extension in Nelson is set by England's householder rules and your council.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Nelson like to extend?
Nelson has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.
How a rear extension in Nelson comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Nelson
Close by, we work in Brierfield, about 1.5 miles away, and Colne, about 2.1 miles away.
- Rear extension planning drawings in Brierfield
- Rear extension planning drawings in Colne
- Rear extension planning drawings in Burnley
- Rear extension planning drawings in Padiham
- Rear extension planning drawings in Barnoldswick
Other work in Nelson:
FAQ
Rear extension planning drawings questions in Nelson
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Is the site visit in Nelson free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Can I see the design in 3D?
Yes; we produce simple 3D views so you can judge the size and light.
How long does a rear extension take to build in Nelson?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can you match the brick or stone on my Nelson house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.