Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Cheadle Hulme, Greater Manchester

Rear extension planning drawings in Cheadle Hulme

Thinking about a rear extension in Cheadle Hulme? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Cheadle Hulme and its postcode districts SK3, SK7 and SK8 are part of our Greater Manchester coverage. Planning applications in Cheadle Hulme go to the local planning authority covering Cheadle Hulme, and we check its local design guidance for rear extensions before drawing.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

What do rear extension planning drawings cost in Cheadle Hulme?

As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a rear extension in Cheadle Hulme?

Planning for a rear extension in Cheadle Hulme follows the English householder rules.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Cheadle Hulme like to extend?

Cheadle Hulme has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.

How a rear extension in Cheadle Hulme comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Rear extension planning drawings near Cheadle Hulme

Close by, we work in Bramhall, about 1.6 miles away, and Stockport, about 2.7 miles away.

Other work in Cheadle Hulme:

All rear extensions in Cheadle Hulme

FAQ

Rear extension planning drawings questions in Cheadle Hulme

How long does a rear extension take to build in Cheadle Hulme?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can planning conditions affect the build?

Yes, for example matching materials or obscure glazing. We plan for them.

Do you handle building control in Cheadle Hulme?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price