Shepherds Bush, Greater London
Rear extension planning drawings in Shepherds Bush
Thinking about a rear extension in Shepherds Bush? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
We cover Shepherds Bush (W11, W12 and W14) as part of our Greater London work. For Shepherds Bush homes we start with a measured survey, then draw options before anything is submitted.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Shepherds Bush?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a rear extension in Shepherds Bush?
The planning route for a rear extension in Shepherds Bush is set by England's householder rules and your council.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Shepherds Bush like to extend?
Period terraces in Shepherds Bush sit alongside flats, and the difference matters: houses usually keep permitted development rights, while flats and maisonettes need planning permission for any rear extension. Rear extension applications in Greater London are householder applications, which councils aim to decide within about eight weeks.
How a rear extension in Shepherds Bush comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Shepherds Bush
From Shepherds Bush, the nearest places we also cover are Notting Hill (0.8 miles) and Queen's Park (1.8 miles).
- Rear extension planning drawings in Notting Hill
- Rear extension planning drawings in Queen's Park
- Rear extension planning drawings in Kensal Green
- Rear extension planning drawings in Chiswick
- Rear extension planning drawings in Fulham
Other work in Shepherds Bush:
FAQ
Rear extension planning drawings questions in Shepherds Bush
What postcode areas do you cover around Shepherds Bush?
Including W11, W12 and W14, and the surrounding Greater London area.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
What if planning is refused?
We review the reasons with you, amend and resubmit (often free of a second fee within 12 months in England) or appeal.
How long does a rear extension take to build in Shepherds Bush?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Is the site visit in Shepherds Bush free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.