Greenford, Greater London
Rear extension planning drawings in Greenford
Thinking about a rear extension in Greenford? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
We cover Greenford (UB1, UB5 and UB6) as part of our Greater London work. For Greenford homes we start with a measured survey, then draw options before anything is submitted.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Greenford?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a rear extension in Greenford?
Whether your rear extension in Greenford needs a planning application depends on its size, your house and any local restrictions.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Greenford like to extend?
Greenford is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a rear extension in Greenford comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Rear extension planning drawings near Greenford
We also build rear extensions in nearby Northolt (1.5 miles) and Southall (1.5 miles).
- Rear extension planning drawings in Northolt
- Rear extension planning drawings in Southall
- Rear extension planning drawings in West Ealing
- Rear extension planning drawings in Sudbury
- Rear extension planning drawings in South Ruislip
Other work in Greenford:
FAQ
Rear extension planning drawings questions in Greenford
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Can I see the design in 3D?
Yes; we produce simple 3D views so you can judge the size and light.
Is the site visit in Greenford free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
How long does a rear extension take to build in Greenford?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
What postcode areas do you cover around Greenford?
Including UB1, UB5 and UB6, and the surrounding Greater London area.