Colchester, Essex
Rear extension planning drawings in Colchester
Measured survey, design options, planning drawings and the application, handled for you. If you live in Colchester and want to know what a rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Colchester sits in Essex, with postcode districts including CO1, CO2, CO3 and CO4. Rear extension applications in Essex are householder applications, which councils aim to decide within about eight weeks.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Colchester?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a rear extension in Colchester?
Here is how the rules in England apply to a rear extension in Colchester.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Colchester like to extend?
Colchester mixes Victorian terraces with 1930s semis, so both side returns and full-width kitchen extensions suit houses here.
How a rear extension in Colchester comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Colchester
From Colchester, the nearest places we also cover are Halstead (11.9 miles) and Sudbury (12.7 miles).
- Rear extension planning drawings in Halstead
- Rear extension planning drawings in Sudbury
- Rear extension planning drawings in Clacton-on-Sea
- Rear extension planning drawings in Witham
- Rear extension planning drawings in Maldon
Other work in Colchester:
FAQ
Rear extension planning drawings questions in Colchester
What postcode areas do you cover around Colchester?
Including CO1, CO2, CO3 and CO4, and the surrounding Essex area.
How long does a rear extension take to build in Colchester?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need an architect?
You need accurate drawings by someone who knows householder planning; we provide them.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Do you handle building control in Colchester?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.