Dorchester, Dorset
Rear extension planning drawings in Dorchester
Thinking about a rear extension in Dorchester? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Dorchester sits in Dorset, with postcode districts including DT1. Rear extension applications in Dorset are householder applications, which councils aim to decide within about eight weeks.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Dorchester?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a rear extension in Dorchester?
Planning for a rear extension in Dorchester follows the English householder rules.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Dorchester like to extend?
Stone-built and rendered houses are common around Dorchester, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.
How a rear extension in Dorchester comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Dorchester
We also build rear extensions in nearby Weymouth (7.2 miles) and Portland (10.3 miles).
- Rear extension planning drawings in Weymouth
- Rear extension planning drawings in Portland
- Rear extension planning drawings in Bridport
- Rear extension planning drawings in Blandford Forum
- Rear extension planning drawings in Yeovil
Other work in Dorchester:
FAQ
Rear extension planning drawings questions in Dorchester
How long does a rear extension take to build in Dorchester?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
What do rear extension planning drawings cost in Dorchester?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension and £2,000–£3,500 for a two-storey scheme, covering the measured survey, design options and the application. The council fee is extra.
Do neighbours get consulted?
Yes for a full application: the council writes to them or puts up a site notice.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Can you match the brick or stone on my Dorchester house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.