Rear extension planning drawings in Truro
For homes in Truro, a rear extension is often the simplest way to gain space without moving. Measured survey, design options, planning drawings and the application, handled for you. We take it from survey to completion certificate.
We cover Truro (TR1) as part of our Cornwall work. Rear extension applications in Cornwall are householder applications, which councils aim to decide within about eight weeks.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Truro?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a rear extension in Truro?
The planning route for a rear extension in Truro is set by England's householder rules and your council.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Truro like to extend?
Truro has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.
How a rear extension in Truro comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Truro
Neighbouring places we cover include Falmouth (7.7 miles) and Redruth (7.8 miles).
- Rear extension planning drawings in Falmouth
- Rear extension planning drawings in Redruth
- Rear extension planning drawings in Newquay
- Rear extension planning drawings in Camborne
- Rear extension planning drawings in St Austell
Other work in Truro:
FAQ
Rear extension planning drawings questions in Truro
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Can I see the design in 3D?
Yes; we produce simple 3D views so you can judge the size and light.
What do rear extension planning drawings cost in Truro?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension and £2,000–£3,500 for a two-storey scheme, covering the measured survey, design options and the application. The council fee is extra.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
How long does a rear extension take to build in Truro?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.