Amersham, Buckinghamshire
Rear extension planning drawings in Amersham
Measured survey, design options, planning drawings and the application, handled for you. We design, get the approvals for and build rear extensions in Amersham and the surrounding area, with one contract from the first survey to building control sign-off.
Amersham sits in Buckinghamshire, with postcode districts including HP6 and HP7. Rear extension applications in Buckinghamshire are householder applications, which councils aim to decide within about eight weeks.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Amersham?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a rear extension in Amersham?
The planning route for a rear extension in Amersham is set by England's householder rules and your council.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Amersham like to extend?
Commuter semis and detached houses make up much of Amersham, and longer gardens make England's prior approval route for deeper rear extensions worth considering.
How a rear extension in Amersham comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Rear extension planning drawings near Amersham
From Amersham, the nearest places we also cover are Amersham on the Hill (0.7 miles) and Chesham (2.4 miles).
- Rear extension planning drawings in Amersham on the Hill
- Rear extension planning drawings in Chesham
- Rear extension planning drawings in Beaconsfield
- Rear extension planning drawings in Chorleywood
- Rear extension planning drawings in Chalfont St Peter
Other work in Amersham:
FAQ
Rear extension planning drawings questions in Amersham
Do I need planning permission for a rear extension in Amersham?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
What if planning is refused?
We review the reasons with you, amend and resubmit (often free of a second fee within 12 months in England) or appeal.
How long does a rear extension take to build in Amersham?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.