Windsor, Berkshire
Rear extension planning drawings in Windsor
Thinking about a rear extension in Windsor? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Windsor is covered from our Berkshire round, including SL4. For Windsor homes we start with a measured survey, then draw options before anything is submitted.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Windsor?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a rear extension in Windsor?
Here is how the rules in England apply to a rear extension in Windsor.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Windsor like to extend?
Windsor has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey. Rear extension applications in Berkshire are householder applications, which councils aim to decide within about eight weeks.
How a rear extension in Windsor comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Rear extension planning drawings near Windsor
Neighbouring places we cover include Slough (1.8 miles) and Egham (4.1 miles).
- Rear extension planning drawings in Slough
- Rear extension planning drawings in Egham
- Rear extension planning drawings in Burnham
- Rear extension planning drawings in Staines
- Rear extension planning drawings in Stanwell
Other work in Windsor:
FAQ
Rear extension planning drawings questions in Windsor
Do I need planning permission for a rear extension in Windsor?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Do I need an architect?
You need accurate drawings by someone who knows householder planning; we provide them.
How long does a rear extension take to build in Windsor?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Do you handle building control in Windsor?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.