Northumberland
Permitted development rear extensions in Northumberland
Designing to the no-application limits, with a lawful development certificate as proof. Rear extensions in Northumberland: we cover 10 towns including Blyth, Cramlington and Ashington, with design, approvals and the build under one contract.

Brick terraces, colliery houses and post-war semis make up much of Northumberland. Former mining areas often need a coal mining risk check before foundations are designed.
How much does a permitted development rear extension cost in Northumberland?
A permitted development rear extension in Northumberland is priced at £1,710–£2,790 per square metre including VAT as a guide, before kitchen fit-out and fees. North East prices are among the lowest in our range; former mining ground is the main foundation variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £20,500–£33,500 |
| 4 m wide × 5 m deep (20 m²) | £34,000–£56,000 |
| 4 m wide × 6 m deep (24 m²) | £41,000–£67,000 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission in Northumberland?
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.
Where in Northumberland do we work?
FAQ
Questions people ask
Is permitted development the same as planning permission?
No; it is a national grant of permission for work within set limits, so no application is needed.
Do I still need Building Regulations?
Yes, always.
Can my neighbours object?
Not to permitted development itself, though they can ask the council to check it complies. Prior approval does involve neighbour consultation.
Do you cover all of Northumberland?
We cover 10 towns and districts in Northumberland, including Blyth, Cramlington and Ashington.
Who builds the extension?
Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.