Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Mid Wales

Permitted development rear extensions in Mid Wales

Designing to the no-application limits, with a lawful development certificate as proof. Rear extensions in Mid Wales: we cover 4 towns including Newtown, Brecon and Welshpool, with design, approvals and the build under one contract.

Tape measure and string line marking out a rear extension footprint in a back garden

Older terraces near the centre and post-war semis further out are typical of Mid Wales. Sloping sites are common in Wales, so floor levels and retaining walls are designed at the start.

How much does a permitted development rear extension cost in Mid Wales?

A permitted development rear extension in Mid Wales is priced at £1,770–£2,880 per square metre including VAT as a guide, before kitchen fit-out and fees. Prices in Wales sit below our West Midlands baseline; sloping sites are the main variable.

Permitted development rear extension guide prices in Mid Wales
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,000–£34,500
4 m wide × 5 m deep (20 m²)£35,500–£57,500
4 m wide × 6 m deep (24 m²)£42,500–£69,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission in Mid Wales?

Welsh permitted development allows a single-storey rear extension of up to 4 metres in depth and 4 metres in height, subject to boundary and garden-coverage limits. There is no larger-extension prior approval scheme in Wales.

Welsh rules allow a two-storey rear extension without an application only where the ground floor is no deeper than 4 metres, the upper floor no deeper than 3 metres and at least 10.5 metres remains to the rear boundary. Most homeowners still apply for householder planning permission.

Conservation areas, National Parks and National Landscapes restrict permitted development in Wales, and listed buildings need listed building consent.

Where in Mid Wales do we work?

FAQ

Questions people ask

Is permitted development the same as planning permission?

No; it is a national grant of permission for work within set limits, so no application is needed.

Do I still need Building Regulations?

Yes, always.

Can my neighbours object?

Not to permitted development itself, though they can ask the council to check it complies. Prior approval does involve neighbour consultation.

Do you cover all of Mid Wales?

We cover 4 towns and districts in Mid Wales, including Newtown, Brecon and Welshpool.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price