Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Fife

Permitted development rear extensions in Fife

Designing to the no-application limits, with a certificate of lawfulness of proposed use or development as proof. Rear extensions in Fife: we cover 7 towns including Dunfermline, Kirkcaldy and Glenrothes, with design, approvals and the build under one contract.

Tape measure and string line marking out a rear extension footprint in a back garden

Post-war semis and terraces are common around Fife, and many have room for a single-storey rear extension within Class 1A limits.

How much does a permitted development rear extension cost in Fife?

Guide prices for a permitted development rear extension in Fife start from our Scotland rate of £1,800–£2,940 per square metre, including VAT. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Permitted development rear extension guide prices in Fife
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,500–£35,500
4 m wide × 5 m deep (20 m²)£36,000–£59,000
4 m wide × 6 m deep (24 m²)£43,500–£70,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission in Fife?

Scottish householder permitted development (Class 1A) covers many single-storey rear extensions, with a 3 metre eaves limit, a 4 metre height limit and, within 1 metre of a boundary, a depth limit of 3 metres for terraced houses or 4 metres for others. Conservation areas are excluded, and you need a building warrant whatever the planning position.

Scottish Class 1B rights for extensions of more than one storey need a 10 metre gap to every boundary, which few gardens have. Expect a planning application as well as a building warrant for a double-storey rear extension.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent.

Where in Fife do we work?

FAQ

Questions people ask

Is permitted development the same as planning permission?

No; it is a national grant of permission for work within set limits, so no application is needed.

Do I still need Building Regulations?

Yes, always.

How long does a certificate of lawfulness of proposed use or development take?

Councils should decide within 8 weeks.

Do you cover all of Fife?

We cover 7 towns and districts in Fife, including Dunfermline, Kirkcaldy and Glenrothes.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price