Cornwall
Permitted development rear extensions in Cornwall
Designing to the no-application limits, with a lawful development certificate as proof. Across Cornwall we handle the whole rear extension: survey, drawings, the planning route, building control and the build. Towns we cover here include Redruth, Falmouth and St Austell.

Stone-built and rendered houses are common around Cornwall, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.
How much does a permitted development rear extension cost in Cornwall?
Guide prices for a permitted development rear extension in Cornwall start from our South West England rate of £1,980–£3,220 per square metre, including VAT. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £23,500–£38,500 |
| 4 m wide × 5 m deep (20 m²) | £39,500–£64,500 |
| 4 m wide × 6 m deep (24 m²) | £47,500–£77,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission in Cornwall?
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent.
Where in Cornwall do we work?
FAQ
Questions people ask
Is permitted development the same as planning permission?
No; it is a national grant of permission for work within set limits, so no application is needed.
Do I still need Building Regulations?
Yes, always.
Can my neighbours object?
Not to permitted development itself, though they can ask the council to check it complies. Prior approval does involve neighbour consultation.
Do you cover all of Cornwall?
We cover 10 towns and districts in Cornwall, including Redruth, Falmouth and St Austell.
Who builds the extension?
Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.