Childwall, Merseyside
Kitchen-diner rear extension in Childwall
For homes in Childwall, a kitchen-diner rear extension is often the simplest way to gain space without moving. An open-plan kitchen, dining and family room that opens straight onto the garden. We take it from survey to completion certificate.
We cover Childwall (L15, L16 and L18) as part of our Merseyside work. A kitchen-diner is often the reason people in Childwall extend: the back kitchen in terraced streets and 1930s semis is rarely big enough for a table.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a kitchen-diner rear extension cost in Childwall?
For Childwall we work from the North West England rate: £1,790–£2,910 per square metre of new floor, including VAT, standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,500–£35,000 |
| 4 m wide × 5 m deep (20 m²) | £35,500–£58,500 |
| 4 m wide × 6 m deep (24 m²) | £43,000–£70,000 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a kitchen-diner rear extension in Childwall?
Whether your kitchen-diner rear extension in Childwall needs a planning application depends on its size, your house and any local restrictions.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Childwall like to extend?
Childwall has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.
How a kitchen-diner rear extension in Childwall comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Kitchen-diner rear extensions near Childwall
From Childwall, the nearest places we also cover are Wavertree (0.8 miles) and Old Swan (1.3 miles).
- Kitchen-diner rear extension in Wavertree
- Kitchen-diner rear extension in Old Swan
- Kitchen-diner rear extension in Knotty Ash
- Kitchen-diner rear extension in Mossley Hill
- Kitchen-diner rear extension in Belle Vale
Other work in Childwall:
FAQ
Kitchen-diner rear extension questions in Childwall
How long does a rear extension take to build in Childwall?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do you handle building control in Childwall?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Do you fit the kitchen?
Yes, whether you buy it yourself or we supply it. We take the measurements from the built shell, not the drawings.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.