Leominster, Herefordshire
Kitchen-diner rear extension in Leominster
For homes in Leominster, a kitchen-diner rear extension is often the simplest way to gain space without moving. An open-plan kitchen, dining and family room that opens straight onto the garden. We take it from survey to completion certificate.
Leominster is covered from our Herefordshire round, including HR6. A kitchen-diner is often the reason people in Leominster extend: the back kitchen in post-war semis and estate houses is rarely big enough for a table.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a kitchen-diner rear extension cost in Leominster?
A kitchen-diner rear extension in Leominster is priced at £1,900–£3,100 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £23,000–£37,000 |
| 4 m wide × 5 m deep (20 m²) | £38,000–£62,000 |
| 4 m wide × 6 m deep (24 m²) | £45,500–£74,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a kitchen-diner rear extension in Leominster?
Whether your kitchen-diner rear extension in Leominster needs a planning application depends on its size, your house and any local restrictions.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Leominster like to extend?
Leominster has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build. We usually keep the working kitchen where the old one was and put the dining table in the new space by the doors, which suits most Leominster homes.
How a kitchen-diner rear extension in Leominster comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Kitchen-diner rear extensions near Leominster
Close by, we work in Ludlow, about 10.3 miles away, and Hereford, about 11.7 miles away.
- Kitchen-diner rear extension in Ludlow
- Kitchen-diner rear extension in Hereford
- Kitchen-diner rear extension in Ledbury
- Kitchen-diner rear extension in Great Malvern
- Kitchen-diner rear extension in Stourport-on-Severn
Other work in Leominster:
FAQ
Kitchen-diner rear extension questions in Leominster
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
How long does a rear extension take to build in Leominster?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can I add a utility room?
Often. A narrow utility or boot room along one side keeps the washing machine out of the open-plan space.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Do you handle building control in Leominster?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.