Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Honiton, Devon

Kitchen-diner rear extension in Honiton

An open-plan kitchen, dining and family room that opens straight onto the garden. We design, get the approvals for and build kitchen-diner rear extensions in Honiton and the surrounding area, with one contract from the first survey to building control sign-off.

Honiton is covered from our Devon round, including EX14. For Honiton kitchens we plan the extraction route and the island drainage before the slab is poured, so nothing has to be chased in later.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a kitchen-diner rear extension cost in Honiton?

For Honiton we work from the South West England rate: £1,980–£3,220 per square metre of new floor, including VAT, standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Kitchen-diner rear extension prices in Honiton
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£23,500–£38,500
4 m wide × 5 m deep (20 m²)£39,500–£64,500
4 m wide × 6 m deep (24 m²)£47,500–£77,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a kitchen-diner rear extension in Honiton?

The planning route for a kitchen-diner rear extension in Honiton is set by England's householder rules and your council.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Honiton like to extend?

Stone-built and rendered houses are common around Honiton, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.

How a kitchen-diner rear extension in Honiton comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Kitchen-diner rear extensions near Honiton

Close by, we work in Sidmouth, about 7.8 miles away, and Chard, about 11.0 miles away.

Other work in Honiton:

All rear extensions in Honiton

FAQ

Kitchen-diner rear extension questions in Honiton

Do I need planning permission for a rear extension in Honiton?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Should the sink face the garden?

If the plan allows, an island sink or hob facing the glass is a common choice. It needs a floor-level drain run, which is easy to lay in a new slab.

Is the site visit in Honiton free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do you handle building control in Honiton?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How long does a rear extension take to build in Honiton?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price