Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Cockington, Devon

Kitchen-diner rear extension in Cockington

Kitchen-diner rear extension in Cockington: an open-plan kitchen, dining and family room that opens straight onto the garden. We measure the house, show you what the rules allow, price it in writing and build it.

Cockington is covered from our Devon round, including TQ1, TQ2 and TQ3. We usually keep the working kitchen where the old one was and put the dining table in the new space by the doors, which suits most Cockington homes.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a kitchen-diner rear extension cost in Cockington?

Guide prices for a kitchen-diner rear extension in Cockington start from our South West England rate of £1,980–£3,220 per square metre, including VAT. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Kitchen-diner rear extension prices in Cockington
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£23,500–£38,500
4 m wide × 5 m deep (20 m²)£39,500–£64,500
4 m wide × 6 m deep (24 m²)£47,500–£77,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a kitchen-diner rear extension in Cockington?

Whether your kitchen-diner rear extension in Cockington needs a planning application depends on its size, your house and any local restrictions.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Cockington like to extend?

Cockington has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.

How a kitchen-diner rear extension in Cockington comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Kitchen-diner rear extensions near Cockington

We also build kitchen-diner rear extensions in nearby Torquay (1.4 miles) and Paignton (2.0 miles).

Other work in Cockington:

All rear extensions in Cockington

FAQ

Kitchen-diner rear extension questions in Cockington

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Cockington?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I have underfloor heating?

Yes. Wet underfloor heating in the new screed is the usual choice, often with the old room's radiators kept or replaced.

Can you match the brick or stone on my Cockington house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need planning permission for a rear extension in Cockington?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price