Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Knutsford, Cheshire

Kitchen-diner rear extension in Knutsford

We plan and build kitchen-diner rear extensions for homeowners in Knutsford. An open-plan kitchen, dining and family room that opens straight onto the garden. Start with a free site visit, then a written price once the design is agreed.

Knutsford is covered from our Cheshire round, including WA16. For Knutsford kitchens we plan the extraction route and the island drainage before the slab is poured, so nothing has to be chased in later.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a kitchen-diner rear extension cost in Knutsford?

In Knutsford, our guide for a kitchen-diner rear extension is £1,790–£2,910 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Kitchen-diner rear extension prices in Knutsford
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,500–£35,000
4 m wide × 5 m deep (20 m²)£35,500–£58,500
4 m wide × 6 m deep (24 m²)£43,000–£70,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a kitchen-diner rear extension in Knutsford?

Whether your kitchen-diner rear extension in Knutsford needs a planning application depends on its size, your house and any local restrictions.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Knutsford like to extend?

Stone and brick terraces are common around Knutsford. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a kitchen-diner rear extension in Knutsford comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Kitchen-diner rear extensions near Knutsford

Neighbouring places we cover include Hale (5.5 miles) and Altrincham (5.9 miles).

Other work in Knutsford:

All rear extensions in Knutsford

FAQ

Kitchen-diner rear extension questions in Knutsford

Is the site visit in Knutsford free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

How much does a kitchen-diner rear extension cost in Knutsford?

As a guide, £1,790–£2,910 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £21,500–£35,000 at that rate. Your written price follows the survey.

Can I add a utility room?

Often. A narrow utility or boot room along one side keeps the washing machine out of the open-plan space.

How long does a rear extension take to build in Knutsford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price