East Molesey, Surrey
Glazed rear extension in East Molesey
Glazed rear extension in East Molesey: full-height glass, slim frames and big rooflights for the most open rear room. We measure the house, show you what the rules allow, price it in writing and build it.
East Molesey and its postcode districts KT7, KT8 and KT10 are part of our Surrey coverage. Glass-led rear extensions in East Molesey are planned around which way the garden faces, because that decides the glass specification.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a glazed rear extension cost in East Molesey?
For East Molesey we work from the South East England rate: £3,140–£5,380 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £37,500–£64,500 |
| 4 m wide × 6 m deep (24 m²) | £75,500–£129,000 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a glazed rear extension in East Molesey?
Whether your glazed rear extension in East Molesey needs a planning application depends on its size, your house and any local restrictions.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in East Molesey like to extend?
Around East Molesey the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.
How a glazed rear extension in East Molesey comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Glazed rear extensions near East Molesey
From East Molesey, the nearest places we also cover are Hampton (1.3 miles) and West Molesey (1.3 miles).
- Glazed rear extension in Hampton
- Glazed rear extension in West Molesey
- Glazed rear extension in Hampton Wick
- Glazed rear extension in Esher
- Glazed rear extension in Surbiton
Other work in East Molesey:
FAQ
Glazed rear extension questions in East Molesey
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
What postcode areas do you cover around East Molesey?
Including KT7, KT8 and KT10, and the surrounding Surrey area.
Is there a limit on how much glass I can have?
In England the simple rule is 25% of the floor area plus openings removed; more is allowed with a calculation showing the house still meets Part L.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
How long does a rear extension take to build in East Molesey?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.