Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Kesgrave, Suffolk

Glazed rear extension in Kesgrave

Full-height glass, slim frames and big rooflights for the most open rear room. If you live in Kesgrave and want to know what a glazed rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

We cover Kesgrave (IP5) as part of our Suffolk work. If your garden in Kesgrave faces south, expect us to talk about overhangs and solar-control glass before frame colours.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Kesgrave?

A glazed rear extension in Kesgrave is priced at £2,970–£5,090 per square metre including VAT as a guide, before kitchen fit-out and fees. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Glazed rear extension prices in Kesgrave
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£35,500–£61,000
4 m wide × 6 m deep (24 m²)£71,000–£122,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a glazed rear extension in Kesgrave?

The planning route for a glazed rear extension in Kesgrave is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Kesgrave like to extend?

Post-war semis and newer estates are typical of Kesgrave, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a glazed rear extension in Kesgrave comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Glazed rear extensions near Kesgrave

From Kesgrave, the nearest places we also cover are Ipswich (3.5 miles) and Woodbridge (4.2 miles).

Other work in Kesgrave:

All rear extensions in Kesgrave

FAQ

Glazed rear extension questions in Kesgrave

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can I have a level threshold?

Yes, with a drainage channel outside the doors and the slab set to the patio level.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Do you handle building control in Kesgrave?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How long does a rear extension take to build in Kesgrave?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price