Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Maidstone, Kent

Glazed rear extension in Maidstone

Glazed rear extension in Maidstone: full-height glass, slim frames and big rooflights for the most open rear room. We measure the house, show you what the rules allow, price it in writing and build it.

Maidstone and its postcode districts ME14, ME15 and ME16 are part of our Kent coverage. A wide sliding door with one long rooflight, rather than a fully glazed roof, keeps a glass-led extension usable in summer.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Maidstone?

Guide prices for a glazed rear extension in Maidstone start from our South East England rate of £3,140–£5,380 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Glazed rear extension prices in Maidstone
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£37,500–£64,500
4 m wide × 6 m deep (24 m²)£75,500–£129,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a glazed rear extension in Maidstone?

Planning for a glazed rear extension in Maidstone follows the English householder rules.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Maidstone like to extend?

Maidstone has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a glazed rear extension in Maidstone comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Glazed rear extensions near Maidstone

From Maidstone, the nearest places we also cover are Snodland (5.4 miles) and Chatham (7.8 miles).

Other work in Maidstone:

All rear extensions in Maidstone

FAQ

Glazed rear extension questions in Maidstone

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can you match the brick or stone on my Maidstone house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Can I have a level threshold?

Yes, with a drainage channel outside the doors and the slab set to the patio level.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Is the site visit in Maidstone free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

How long does a rear extension take to build in Maidstone?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price