Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hartley, Kent

Glazed rear extension in Hartley

Thinking about a glazed rear extension in Hartley? Full-height glass, slim frames and big rooflights for the most open rear room. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Hartley sits in Kent, with postcode districts including DA3. A wide sliding door with one long rooflight, rather than a fully glazed roof, keeps a glass-led extension usable in summer.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Hartley?

A glazed rear extension in Hartley is priced at £3,140–£5,380 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Glazed rear extension prices in Hartley
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£37,500–£64,500
4 m wide × 6 m deep (24 m²)£75,500–£129,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a glazed rear extension in Hartley?

Planning for a glazed rear extension in Hartley follows the English householder rules.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Hartley like to extend?

Hartley has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a glazed rear extension in Hartley comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Glazed rear extensions near Hartley

Neighbouring places we cover include Longfield (0.7 miles) and Swanscombe (4.2 miles).

Other work in Hartley:

All rear extensions in Hartley

FAQ

Glazed rear extension questions in Hartley

Is the site visit in Hartley free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will a glass extension be too hot?

Not if it is designed for its orientation, with solar-control glass, shading and ventilation.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Hartley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price