Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Bordon, Hampshire

Glazed rear extension in Bordon

Glazed rear extension in Bordon: full-height glass, slim frames and big rooflights for the most open rear room. We measure the house, show you what the rules allow, price it in writing and build it.

Bordon sits in Hampshire, with postcode districts including GU30 and GU35. A wide sliding door with one long rooflight, rather than a fully glazed roof, keeps a glass-led extension usable in summer.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Bordon?

In Bordon, our guide for a glazed rear extension is £3,140–£5,380 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Glazed rear extension prices in Bordon
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£37,500–£64,500
4 m wide × 6 m deep (24 m²)£75,500–£129,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a glazed rear extension in Bordon?

Planning for a glazed rear extension in Bordon follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Bordon like to extend?

Bordon has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a glazed rear extension in Bordon comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Glazed rear extensions near Bordon

We also build glazed and glass-box rear extensions in nearby Alton (5.5 miles) and Haslemere (6.9 miles).

Other work in Bordon:

All rear extensions in Bordon

FAQ

Glazed rear extension questions in Bordon

Do I need planning permission for a rear extension in Bordon?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Bordon?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I have a level threshold?

Yes, with a drainage channel outside the doors and the slab set to the patio level.

Do you handle building control in Bordon?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can you match the brick or stone on my Bordon house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price