Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Basingstoke, Hampshire

Glazed rear extension in Basingstoke

Full-height glass, slim frames and big rooflights for the most open rear room. We design, get the approvals for and build glazed and glass-box rear extensions in Basingstoke and the surrounding area, with one contract from the first survey to building control sign-off.

Basingstoke is covered from our Hampshire round, including RG21, RG22, RG23 and RG24. A wide sliding door with one long rooflight, rather than a fully glazed roof, keeps a glass-led extension usable in summer.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Basingstoke?

A glazed rear extension in Basingstoke is priced at £3,140–£5,380 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Glazed rear extension prices in Basingstoke
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£37,500–£64,500
4 m wide × 6 m deep (24 m²)£75,500–£129,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a glazed rear extension in Basingstoke?

Planning for a glazed rear extension in Basingstoke follows the English householder rules.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Basingstoke like to extend?

Basingstoke has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a glazed rear extension in Basingstoke comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Glazed rear extensions near Basingstoke

Close by, we work in Tadley, about 6.3 miles away, and Alton, about 9.2 miles away.

Other work in Basingstoke:

All rear extensions in Basingstoke

FAQ

Glazed rear extension questions in Basingstoke

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can I have a level threshold?

Yes, with a drainage channel outside the doors and the slab set to the patio level.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Basingstoke?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can you match the brick or stone on my Basingstoke house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price