Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Manchester, Greater Manchester

Glazed rear extension in Manchester

Full-height glass, slim frames and big rooflights for the most open rear room. If you live in Manchester and want to know what a glazed rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Manchester and its postcode districts M9, M11, M12 and M15 are part of our Greater Manchester coverage. A wide sliding door with one long rooflight, rather than a fully glazed roof, keeps a glass-led extension usable in summer.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Manchester?

For Manchester we work from the North West England rate: £2,630–£4,510 per square metre of new floor, including VAT, standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Glazed rear extension prices in Manchester
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£31,500–£54,000
4 m wide × 6 m deep (24 m²)£63,000–£108,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a glazed rear extension in Manchester?

Whether your glazed rear extension in Manchester needs a planning application depends on its size, your house and any local restrictions.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Manchester like to extend?

Manchester has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.

How a glazed rear extension in Manchester comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Glazed rear extensions near Manchester

Close by, we work in Manchester City Centre, about 0.3 miles away, and Cheetham Hill, about 1.2 miles away.

Other work in Manchester:

All rear extensions in Manchester

FAQ

Glazed rear extension questions in Manchester

Is the site visit in Manchester free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

How much does a glazed rear extension cost in Manchester?

As a guide, £2,630–£4,510 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £31,500–£54,000 at that rate. Your written price follows the survey.

Is there a limit on how much glass I can have?

In England the simple rule is 25% of the floor area plus openings removed; more is allowed with a calculation showing the house still meets Part L.

How long does a rear extension take to build in Manchester?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price