Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

South Ruislip, Greater London

Glazed rear extension in South Ruislip

Full-height glass, slim frames and big rooflights for the most open rear room. We design, get the approvals for and build glazed and glass-box rear extensions in South Ruislip and the surrounding area, with one contract from the first survey to building control sign-off.

We cover South Ruislip (HA4, UB5 and UB10) as part of our Greater London work. If your garden in South Ruislip faces south, expect us to talk about overhangs and solar-control glass before frame colours.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in South Ruislip?

A glazed rear extension in South Ruislip is priced at £3,640–£6,240 per square metre including VAT as a guide, before kitchen fit-out and fees. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Glazed rear extension prices in South Ruislip
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£43,500–£75,000
4 m wide × 6 m deep (24 m²)£87,500–£150,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a glazed rear extension in South Ruislip?

The planning route for a glazed rear extension in South Ruislip is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in South Ruislip like to extend?

South Ruislip is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.

How a glazed rear extension in South Ruislip comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Glazed rear extensions near South Ruislip

We also build glazed and glass-box rear extensions in nearby Ruislip Manor (1.0 miles) and Ruislip (1.4 miles).

Other work in South Ruislip:

All rear extensions in South Ruislip

FAQ

Glazed rear extension questions in South Ruislip

Do I need planning permission for a rear extension in South Ruislip?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Is there a limit on how much glass I can have?

In England the simple rule is 25% of the floor area plus openings removed; more is allowed with a calculation showing the house still meets Part L.

How long does a rear extension take to build in South Ruislip?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price