Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Southend-on-Sea, Essex

Glazed rear extension in Southend-on-Sea

Thinking about a glazed rear extension in Southend-on-Sea? Full-height glass, slim frames and big rooflights for the most open rear room. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

We cover Southend-on-Sea (SS0, SS1, SS2 and SS3) as part of our Essex work. Glass-led rear extensions in Southend-on-Sea are planned around which way the garden faces, because that decides the glass specification.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Southend-on-Sea?

For Southend-on-Sea we work from the East of England rate: £2,970–£5,090 per square metre of new floor, including VAT, standard specification. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Glazed rear extension prices in Southend-on-Sea
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£35,500–£61,000
4 m wide × 6 m deep (24 m²)£71,000–£122,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a glazed rear extension in Southend-on-Sea?

Whether your glazed rear extension in Southend-on-Sea needs a planning application depends on its size, your house and any local restrictions.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Southend-on-Sea like to extend?

Southend-on-Sea mixes Victorian terraces with 1930s semis, so both side returns and full-width kitchen extensions suit houses here.

How a glazed rear extension in Southend-on-Sea comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Glazed rear extensions near Southend-on-Sea

Neighbouring places we cover include Rochford (3.1 miles) and Hadleigh (4.6 miles).

Other work in Southend-on-Sea:

All rear extensions in Southend-on-Sea

FAQ

Glazed rear extension questions in Southend-on-Sea

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can you match the brick or stone on my Southend-on-Sea house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Is a glass box a conservatory?

No. It is built to Building Regulations as part of the house, with insulated floor and roof, so it is usable all year.

How long does a rear extension take to build in Southend-on-Sea?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price