Aylesbury, Buckinghamshire
Glazed rear extension in Aylesbury
Full-height glass, slim frames and big rooflights for the most open rear room. We design, get the approvals for and build glazed and glass-box rear extensions in Aylesbury and the surrounding area, with one contract from the first survey to building control sign-off.
Aylesbury and its postcode districts HP19, HP20 and HP21 are part of our Buckinghamshire coverage. A wide sliding door with one long rooflight, rather than a fully glazed roof, keeps a glass-led extension usable in summer.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a glazed rear extension cost in Aylesbury?
A glazed rear extension in Aylesbury is priced at £3,140–£5,380 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £37,500–£64,500 |
| 4 m wide × 6 m deep (24 m²) | £75,500–£129,000 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a glazed rear extension in Aylesbury?
Planning for a glazed rear extension in Aylesbury follows the English householder rules.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Aylesbury like to extend?
Aylesbury has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a glazed rear extension in Aylesbury comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Glazed rear extensions near Aylesbury
Neighbouring places we cover include Tring (6.8 miles) and Thame (8.4 miles).
- Glazed rear extension in Tring
- Glazed rear extension in Thame
- Glazed rear extension in Leighton Buzzard
- Glazed rear extension in Berkhamsted
- Glazed rear extension in Chesham
Other work in Aylesbury:
FAQ
Glazed rear extension questions in Aylesbury
How long does a rear extension take to build in Aylesbury?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Is the site visit in Aylesbury free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Sliding or bifold doors?
Sliders give bigger panes and slimmer sightlines; bifolds open the whole width. Our guide compares them.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Do I need planning permission for a rear extension in Aylesbury?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.