Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Kidderminster, Worcestershire

Two-storey rear extension in Kidderminster

For homes in Kidderminster, a two-storey rear extension is often the simplest way to gain space without moving. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We take it from survey to completion certificate.

Kidderminster and its postcode districts DY10 and DY11 are part of our Worcestershire coverage. In Worcestershire we check the neighbours' rear windows first, because the upper floor is where most two-storey schemes win or lose planning.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in Kidderminster?

A two-storey rear extension in Kidderminster is priced at £1,800–£2,700 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.

Two-storey rear extension prices in Kidderminster
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£54,000–£81,000
4 m × 6 m footprint, two floors (48 m²)£86,500–£129,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a two-storey rear extension in Kidderminster?

Planning for a two-storey rear extension in Kidderminster follows the English householder rules.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Kidderminster like to extend?

Red-brick terraces and 1930s semis make up much of Kidderminster. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a two-storey rear extension in Kidderminster comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Two-storey rear extensions near Kidderminster

Neighbouring places we cover include Stourport-on-Severn (3.6 miles) and Stourbridge (6.5 miles).

Other work in Kidderminster:

All rear extensions in Kidderminster

FAQ

Two-storey rear extension questions in Kidderminster

How much does a two-storey rear extension cost in Kidderminster?

As a guide, £1,800–£2,700 per square metre including VAT for a standard specification. For example, 3 m × 5 m footprint, two floors (30 m²): about £54,000–£81,000 at that rate. Your written price follows the survey.

Do you handle building control in Kidderminster?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Is two-storey cheaper per square metre than single-storey?

Usually yes, because the foundations and roof are shared across twice the floor area. The total cost is higher.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Kidderminster?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price