Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Oldbury, West Midlands

Two-storey rear extension in Oldbury

For homes in Oldbury, a two-storey rear extension is often the simplest way to gain space without moving. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We take it from survey to completion certificate.

Oldbury and its postcode districts B65, B69 and B70 are part of our West Midlands coverage. In the West Midlands we check the neighbours' rear windows first, because the upper floor is where most two-storey schemes win or lose planning.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in Oldbury?

In Oldbury, our guide for a two-storey rear extension is £1,800–£2,700 per square metre including VAT for a standard specification. The West Midlands is the baseline for our guide prices.

Two-storey rear extension prices in Oldbury
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£54,000–£81,000
4 m × 6 m footprint, two floors (48 m²)£86,500–£129,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a two-storey rear extension in Oldbury?

Planning for a two-storey rear extension in Oldbury follows the English householder rules.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Oldbury like to extend?

Red-brick terraces and 1930s semis make up much of Oldbury. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a two-storey rear extension in Oldbury comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Two-storey rear extensions near Oldbury

Close by, we work in West Bromwich, about 1.6 miles away, and Smethwick, about 2.1 miles away.

Other work in Oldbury:

All rear extensions in Oldbury

FAQ

Two-storey rear extension questions in Oldbury

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can it be built on a terraced house?

Sometimes, but the upper floor is harder to get through planning on a terrace because of the effect on neighbours. A single-storey extension with a loft conversion is often an easier route.

What postcode areas do you cover around Oldbury?

Including B65, B69 and B70, and the surrounding West Midlands area.

Is the site visit in Oldbury free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price