Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Oadby, Leicestershire and Rutland

Two-storey rear extension in Oadby

For homes in Oadby, a two-storey rear extension is often the simplest way to gain space without moving. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We take it from survey to completion certificate.

We cover Oadby (LE2) as part of our Leicestershire and Rutland work. In Leicestershire and Rutland we check the neighbours' rear windows first, because the upper floor is where most two-storey schemes win or lose planning.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in Oadby?

A two-storey rear extension in Oadby is priced at £1,750–£2,620 per square metre including VAT as a guide, before kitchen fit-out and fees. East Midlands prices sit a little below our West Midlands baseline.

Two-storey rear extension prices in Oadby
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£52,500–£78,500
4 m × 6 m footprint, two floors (48 m²)£84,000–£125,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a two-storey rear extension in Oadby?

Whether your two-storey rear extension in Oadby needs a planning application depends on its size, your house and any local restrictions.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Oadby like to extend?

Red-brick terraces and semis are typical of Oadby. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a two-storey rear extension in Oadby comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Two-storey rear extensions near Oadby

We also build two-storey rear extensions in nearby Evington (0.8 miles) and Wigston Magna (1.8 miles).

Other work in Oadby:

All rear extensions in Oadby

FAQ

Two-storey rear extension questions in Oadby

Do you handle building control in Oadby?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can it be built on a terraced house?

Sometimes, but the upper floor is harder to get through planning on a terrace because of the effect on neighbours. A single-storey extension with a loft conversion is often an easier route.

How long does a rear extension take to build in Oadby?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need planning permission for a rear extension in Oadby?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price