Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Cowley, Oxfordshire

Bungalow rear extension in Cowley

We plan and build rear extensions for bungalows for homeowners in Cowley. Single-storey rear extensions that keep everything on one level. Start with a free site visit, then a written price once the design is agreed.

Cowley sits in Oxfordshire, with postcode districts including OX1, OX3 and OX4. For Cowley bungalows we design the roof first, because the low eaves decide the height of the new room.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Cowley?

A bungalow rear extension in Cowley is priced at £2,070–£3,360 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Bungalow rear extension prices in Cowley
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,000–£40,500
4 m wide × 6 m deep (24 m²)£49,500–£80,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a bungalow rear extension in Cowley?

The planning route for a bungalow rear extension in Cowley is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Cowley like to extend?

Around Cowley the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a bungalow rear extension in Cowley comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Bungalow rear extensions near Cowley

Neighbouring places we cover include Oxford (2.5 miles) and Abingdon (5.3 miles).

Other work in Cowley:

All rear extensions in Cowley

FAQ

Bungalow rear extension questions in Cowley

What postcode areas do you cover around Cowley?

Including OX1, OX3 and OX4, and the surrounding Oxfordshire area.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How deep can I extend?

The same limits as a house: 3 or 4 metres in England, more with prior approval.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Cowley?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price