Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Boughton, Nottinghamshire

Bungalow rear extension in Boughton

Bungalow rear extension in Boughton: single-storey rear extensions that keep everything on one level. We measure the house, show you what the rules allow, price it in writing and build it.

Boughton and its postcode districts NG22 are part of our Nottinghamshire coverage. For bungalows in Nottinghamshire, a rear extension is the usual way to add space without adding stairs.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Boughton?

In Boughton, our guide for a bungalow rear extension is £1,790–£2,910 per square metre including VAT for a standard specification. East Midlands prices sit a little below our West Midlands baseline.

Bungalow rear extension prices in Boughton
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,500–£35,000
4 m wide × 6 m deep (24 m²)£43,000–£70,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a bungalow rear extension in Boughton?

Planning for a bungalow rear extension in Boughton follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Boughton like to extend?

Red-brick terraces and semis are typical of Boughton. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a bungalow rear extension in Boughton comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Bungalow rear extensions near Boughton

From Boughton, the nearest places we also cover are Retford (8.6 miles) and Mansfield Woodhouse (9.0 miles).

Other work in Boughton:

All rear extensions in Boughton

FAQ

Bungalow rear extension questions in Boughton

Do I need planning permission for a rear extension in Boughton?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Will the roof look odd?

Not if the pitch and tiles match. Where the eaves are low, a flat-roofed section with a lantern is an alternative.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Boughton?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price