Great Harwood, Lancashire
Bungalow rear extension in Great Harwood
Single-storey rear extensions that keep everything on one level. If you live in Great Harwood and want to know what a bungalow rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
We cover Great Harwood (BB5 and BB6) as part of our Lancashire work. For Great Harwood bungalows we design the roof first, because the low eaves decide the height of the new room.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a bungalow rear extension cost in Great Harwood?
For Great Harwood we work from the North West England rate: £1,740–£2,820 per square metre of new floor, including VAT, standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,000–£34,000 |
| 4 m wide × 6 m deep (24 m²) | £41,500–£67,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a bungalow rear extension in Great Harwood?
The planning route for a bungalow rear extension in Great Harwood is set by England's householder rules and your council.
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Great Harwood like to extend?
Stone and brick terraces are common around Great Harwood. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.
How a bungalow rear extension in Great Harwood comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Bungalow rear extensions near Great Harwood
We also build rear extensions for bungalows in nearby Accrington (3.0 miles) and Blackburn (3.9 miles).
- Bungalow rear extension in Accrington
- Bungalow rear extension in Blackburn
- Bungalow rear extension in Padiham
- Bungalow rear extension in Clitheroe
- Bungalow rear extension in Darwen
Other work in Great Harwood:
FAQ
Bungalow rear extension questions in Great Harwood
Do I need planning permission for a rear extension in Great Harwood?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
How deep can I extend?
The same limits as a house: 3 or 4 metres in England, more with prior approval.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
How long does a rear extension take to build in Great Harwood?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
How much does a bungalow rear extension cost in Great Harwood?
As a guide, £1,740–£2,820 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £21,000–£34,000 at that rate. Your written price follows the survey.