Farnworth, Greater Manchester
Bungalow rear extension in Farnworth
We plan and build rear extensions for bungalows for homeowners in Farnworth. Single-storey rear extensions that keep everything on one level. Start with a free site visit, then a written price once the design is agreed.
Farnworth and its postcode districts BL2, BL3 and BL4 are part of our Greater Manchester coverage. For Farnworth bungalows we design the roof first, because the low eaves decide the height of the new room.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a bungalow rear extension cost in Farnworth?
For Farnworth we work from the North West England rate: £1,740–£2,820 per square metre of new floor, including VAT, standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,000–£34,000 |
| 4 m wide × 6 m deep (24 m²) | £41,500–£67,500 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a bungalow rear extension in Farnworth?
Whether your bungalow rear extension in Farnworth needs a planning application depends on its size, your house and any local restrictions.
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Farnworth like to extend?
Stone and brick terraces are common around Farnworth. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.
How a bungalow rear extension in Farnworth comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Bungalow rear extensions near Farnworth
Close by, we work in Little Lever, about 1.3 miles away, and Kearsley, about 1.3 miles away.
- Bungalow rear extension in Little Lever
- Bungalow rear extension in Kearsley
- Bungalow rear extension in Little Hulton
- Bungalow rear extension in Walkden
- Bungalow rear extension in Bolton
Other work in Farnworth:
FAQ
Bungalow rear extension questions in Farnworth
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Is the site visit in Farnworth free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Can I extend the loft as well?
Sometimes, but that is a different project; a rear extension keeps everything on one level.
How long does a rear extension take to build in Farnworth?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do you handle building control in Farnworth?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.