Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Wimbledon Park, Greater London

Bungalow rear extension in Wimbledon Park

Thinking about a bungalow rear extension in Wimbledon Park? Single-storey rear extensions that keep everything on one level. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

We cover Wimbledon Park (SW17, SW18 and SW19) as part of our Greater London work. For Wimbledon Park bungalows we design the roof first, because the low eaves decide the height of the new room.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Wimbledon Park?

Guide prices for a bungalow rear extension in Wimbledon Park start from our London rate of £2,400–£3,900 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Bungalow rear extension prices in Wimbledon Park
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£29,000–£47,000
4 m wide × 6 m deep (24 m²)£57,500–£93,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a bungalow rear extension in Wimbledon Park?

Planning for a bungalow rear extension in Wimbledon Park follows the English householder rules.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Wimbledon Park like to extend?

Period terraces in Wimbledon Park sit alongside flats, and the difference matters: houses usually keep permitted development rights, while flats and maisonettes need planning permission for any rear extension.

How a bungalow rear extension in Wimbledon Park comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Bungalow rear extensions near Wimbledon Park

We also build rear extensions for bungalows in nearby Earlsfield (0.8 miles) and Wimbledon (1.0 miles).

Other work in Wimbledon Park:

All rear extensions in Wimbledon Park

FAQ

Bungalow rear extension questions in Wimbledon Park

Is the site visit in Wimbledon Park free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I extend the loft as well?

Sometimes, but that is a different project; a rear extension keeps everything on one level.

What postcode areas do you cover around Wimbledon Park?

Including SW17, SW18 and SW19, and the surrounding Greater London area.

Do I need planning permission for a rear extension in Wimbledon Park?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Wimbledon Park?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price