Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Braintree, Essex

Bungalow rear extension in Braintree

Thinking about a bungalow rear extension in Braintree? Single-storey rear extensions that keep everything on one level. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

We cover Braintree (CM7 and CM77) as part of our Essex work. For Braintree bungalows we design the roof first, because the low eaves decide the height of the new room.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Braintree?

In Braintree, our guide for a bungalow rear extension is £1,960–£3,180 per square metre including VAT for a standard specification. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Bungalow rear extension prices in Braintree
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£23,500–£38,000
4 m wide × 6 m deep (24 m²)£47,000–£76,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a bungalow rear extension in Braintree?

The planning route for a bungalow rear extension in Braintree is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Braintree like to extend?

Braintree mixes Victorian terraces with 1930s semis, so both side returns and full-width kitchen extensions suit houses here.

How a bungalow rear extension in Braintree comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Bungalow rear extensions near Braintree

From Braintree, the nearest places we also cover are Halstead (5.9 miles) and Witham (6.6 miles).

Other work in Braintree:

All rear extensions in Braintree

FAQ

Bungalow rear extension questions in Braintree

Do you handle building control in Braintree?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need planning permission for a rear extension in Braintree?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need to move out?

Rarely; the opening into the bungalow is made late in the build.

Is the site visit in Braintree free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can you match the brick or stone on my Braintree house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Braintree?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price