High Peak, Derbyshire
Bungalow rear extension in High Peak
Single-storey rear extensions that keep everything on one level. If you live in High Peak and want to know what a bungalow rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
High Peak is covered from our Derbyshire round, including SK23. For bungalows in Derbyshire, a rear extension is the usual way to add space without adding stairs.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a bungalow rear extension cost in High Peak?
A bungalow rear extension in High Peak is priced at £1,790–£2,910 per square metre including VAT as a guide, before kitchen fit-out and fees. East Midlands prices sit a little below our West Midlands baseline.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,500–£35,000 |
| 4 m wide × 6 m deep (24 m²) | £43,000–£70,000 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a bungalow rear extension in High Peak?
Planning for a bungalow rear extension in High Peak follows the English householder rules.
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in High Peak like to extend?
Red-brick terraces and semis are typical of High Peak. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.
How a bungalow rear extension in High Peak comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Bungalow rear extensions near High Peak
Neighbouring places we cover include New Mills (6.4 miles) and Glossop (6.7 miles).
- Bungalow rear extension in New Mills
- Bungalow rear extension in Glossop
- Bungalow rear extension in Buxton
- Bungalow rear extension in Marple
- Bungalow rear extension in Hyde
Other work in High Peak:
FAQ
Bungalow rear extension questions in High Peak
How long does a rear extension take to build in High Peak?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Can a bungalow extension be fully accessible?
Yes: level thresholds, wider doors and a wet room are straightforward to design in.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Do I need planning permission for a rear extension in High Peak?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.